Thursday, April 28, 2011

Walls Going Up

Today at the site we saw (from top to bottom)

The Mechanical Room, drywalled and painted, ready for equipment.









The Electrical Room, drywalled and painted, with installation begun.


















Steel framing, conduit and ductwork in the ceiling.






Our Branch Manager's Office, with a window framed to look out into the library.



It's looking good, and hopefully all the mud will dry up soon so work around the building can really get going!

Thursday, April 14, 2011

Taking Shape










The library is taking shape both inside and out.


From top to bottom, we see:

the view of the library from parking lot;




the shipping and staff entrance;





the bay window in the children's area;










wall framing and duct work ready to install;










looking southeast from the inner entrance to the library;











the lobby;










and the exterior view of the meeting room space from Dean Avenue.


Saturday, March 5, 2011

March of Progress




We've got some new pictures to show the progress of the building. This one is an interior shot looking toward the meeting room area. You can see the large front window.








This picture shows the back south side, where the loading dock will be.





This picture shows the back north side, where staff work space will be located.


The windows will also look into our book sorting room.








Here you can see the front of the building facing Dean, with the overhang. This side will be mostly glass and offer lots of natural light into the library space.










This is the view of the front north corner where the large meeting room space will be. It will offer more space than our meetings rooms at the library downtown and a large window.











Here you see the front of the building looking north, with the overhang and work on the roofing progressing.










This picture shows some of the work going on for the roofing of the main part of the library. You can see the layers of material going on the soffit.















Monday, January 17, 2011

Painswick Branch Taking Shape







Our city project manager says:






As you can see the structural steel is 98% complete and roof decking (the underside of the roof) is complete. Steel studs and exterior insulation are in progress.



The building is starting to take shape!!



Tuesday, January 4, 2011

A New Year 2011




Now that 2011 has come we are gearing up in anticipation for the opening of the new Painswick Branch Library later this year. When visiting the site today you can see that steel structures are going up.

So close yet so far away.

Monday, November 15, 2010

Look the walls are forming



These Pictures were taken November 10 and as you can see the walls are going up. The workers are on site and progress is moving along. It sure looks bettter than a pile of dirt that we started with at the launch of the site.

The neighbors are getting excited as they see progress with their new branch library each month.

Thursday, October 14, 2010

Recent Progress at the Site






We have been seeing footing get finished and walls beginning to appear for the new branch. Rain has made for some delays as concrete work and rain don't always go together, but things are moving forward steadily.

The first picture gives you an overview of the site, the second one is the front wall, which is partially done, with green drainage tubes showing. The third picture is the side and back foundation walls finished.

We're looking forward to the utilities going in soon, which will take us another step forward.