Thursday, April 28, 2011

Walls Going Up

Today at the site we saw (from top to bottom)

The Mechanical Room, drywalled and painted, ready for equipment.









The Electrical Room, drywalled and painted, with installation begun.


















Steel framing, conduit and ductwork in the ceiling.






Our Branch Manager's Office, with a window framed to look out into the library.



It's looking good, and hopefully all the mud will dry up soon so work around the building can really get going!

No comments:

Post a Comment