Today at the site we saw (from top to bottom)
The Mechanical Room, drywalled and painted, ready for equipment.
The Electrical Room, drywalled and painted, with installation begun.
Thursday, April 28, 2011
Thursday, April 14, 2011
Taking Shape
The library is taking shape both inside and out.
From top to bottom, we see:
the view of the library from parking lot;
the shipping and staff entrance;
the bay window in the children's area;
wall framing and duct work ready to install;
looking southeast from the inner entrance to the library;
the lobby;
and the exterior view of the meeting room space from Dean Avenue.
Subscribe to: