Walls Going Up

Today at the site we saw (from top to bottom)

The Mechanical Room, drywalled and painted, ready for equipment.









The Electrical Room, drywalled and painted, with installation begun.


















Steel framing, conduit and ductwork in the ceiling.






Our Branch Manager's Office, with a window framed to look out into the library.



It's looking good, and hopefully all the mud will dry up soon so work around the building can really get going!

Thursday, April 14, 2011

Taking Shape










The library is taking shape both inside and out.


From top to bottom, we see:

the view of the library from parking lot;




the shipping and staff entrance;





the bay window in the children's area;










wall framing and duct work ready to install;










looking southeast from the inner entrance to the library;











the lobby;










and the exterior view of the meeting room space from Dean Avenue.