Today at the site we saw (from top to bottom)The Mechanical Room, drywalled and painted, ready for equipment.
The Electrical Room, drywalled and painted, with installation begun.






The first picture gives you an overview of the site, the second one is the front wall, which is partially done, with green drainage tubes showing. The third picture is the side and back foundation walls finished.
We're looking forward to the utilities going in soon, which will take us another step forward.
Out at the site this morning, before the rain began in earnest we see that the library is starting to take shape. The footings for the new library are in the ground, and include rebar that will link them with the walls above. The picture with the crane is the wall facing Dean Avenue, and you can see the jog in the wall where the entrance will be.The second picture is the wall facing the service road and the Zehr's.
Thanks go to our project manager, Frank, for the pictures.
-- Shonna